
SUSPENSION BRIDGE CONSTRUCTION – WHISTLER PEAK
A jewel in our design-build crown; The Whistler Peak Suspension Bridge – a 427 ft suspension bridge at the peak of Whistler Mountain, located at an elevation of about 7,200 ft above sea level.
A jewel in our design-build crown; The Whistler Peak Suspension Bridge – a 427 ft suspension bridge at the peak of Whistler Mountain, located at an elevation of about 7,200 ft above sea level.
We constructed 4 mountain top microwave towers in the challenging terrain near Stewart, BC. We installed the towers to upgrade high-speed internet at Brucejack Mine.
The infamous Whistler train wreck trail and Trash trail are now linked! Thanks to the new suspension bridge we installed, crossing the Cheakamus River.
During the winter of 2018, we worked with DFO and the Tahltan Nation to stabilize the rock slide area and drill and blast the boulders blocking fish passage.
When this private client toured the Whistler Peak Bridge he knew we were the right team for his project. This impressive wood and steel structure is another Axis design-build masterpiece.